TM 9-2350-222-10-2
OPERATE BOOM (PERFORM AFTER HOISTING OPERATIONS) - Continued
19. Hook left and right staylines (L) on three J-shaped
hooks (R), one hook on right side, two hooks on left
side.
20. Pull back and hold shift lever handle (S).
21. Move shift lever (T) to center (neutral) position.
22. Release shift lever handle (S).
23.
Press down and release accelerator
pedal (U) to unlock lever (V).
24.
Turn off hydraulic system (page 2-
252), if not required for other
operations.
2-309
TA132449