TM 9-2350-222-10-2
PERFORM POST-OPERATING PROCEDURES (STOW SIGHTS) - Continued
13. Latch periscope mount lid (S) by pulling down hard on handle
(T). It may be necessary to slam lid (S) to lock it closed.
14. Lift M27 periscope (U) up into mount (V).
15. Turn two retainers (W) to aline with lugs (X) on periscope (U).
16. Tighten two wing nuts (Y).
17. Return 1/2 inch open end wrench to stowage.
TA132739
2-600