C8, TM 9-2350-230-12
TABLE 11-2.1. PROCEDURE FOR CYCLING CBSS
STEP
PROCEDURE
1
2
3
Turn manual shut off valve to "ON" position.
4
Remove one mounting screw and loosen the other screw of the in-battery switch bracket, and
swing up out of contact with the actuator screw (see fig. 11-2).
NOTE. Do not disturb the setting of switch attachment to bracket.
5
To cycle CBSS, depress plunger of in-battery switch.
WARNING: When 1. 7 second surge of air is completed the breech chamber opens
automatically. All personnel must make certain to stand clear to prevent injury.
6
After completion of CBSS cycling SHUT OFF turret power and return in-battery
switch bracket to original position, replace screws, and tighten.
11-4