TM 9-2350-277-10
PREVENTIVE MAINTENANCE CHECKS AND SERVICES -- Continued
0090 00
ITEM
INTERVAL
MAN-
ITEM TO BE
CREWMEMBER
EQUIPMENT
NO.
HOUR
CHECKED OR
PROCEDURE
NOT READY/
SERVICED
AVAILABLE
IF:
a.
Check transmission oil level. Before
Any sign of
operation, oil level should be at FULL
Class III leak.
mark on gauge rod. Just after carrier
Any fuel leak.
operation when oil is warm, oil level should
be at or just above ADD mark on gauge
rod. Add oil as needed. Do not overfill.
See Lubrication Tables (Table 2, page
0090 00-84
Change 4