TM 9-2590-209-14&P
CHAPTER 8
REWORK VEHICLE COMPONENTS FOR
KIT INSTALLATION
Section I.
PREPARATION OF VEHICLE
8-1. General. This section provides the instructions for
8-2. Initial Preparation..
preparation and rework of M60, M60A1, M60A1 RISE,
and M60A3 tank components prior to installation of the
a. Position the tank on a smooth, level working
M9 bulldozer kit
area.
b. Open the top deck grille doors and engine
exhaust rear grille doors. Remove the transmission
shroud to ventilate the engine compartment prior to
welding on the vehicle.
Section II.
REWORK OF TANK
8-3. General.
This section provides instructions for
the necessary rework to the tank as shown on figures 8-
a. Build-up hinge on left top grille door with weld
1 through 8-14.
(view A).
b. Reverse lower left hinge pin on engine exhaust
left a6cess door (view B).
a. View A shows mounting brackets for installation
of manifold mounting lugs.
b. View B shows fender and shield template.
c. View C shows eye assembly for installing the
a. Remove vehicle headlamp brush guard
mounting brackets.
assemblies. Stow brush guards in left rear fender box.
Remove headlamps, and install receptacle covers (view
d. Views D and E show shock mounting fixtures.
A).
b. Install rod mounting brackets (view B).
8-5. Rework Transmission Shroud
Model Kit Only.
c. Check installation of pins in rod (view C).
a. Cut out access door (view A).
d. Install lugs against pins on rod, and install rod
(view D).
b. Attach hardware to access door (view B).
8-1