TM 9-2590-209-14&P
MAINTENANCE ALLOCATION CHART (CONTINUED)
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
DIRECT
GENERAL
GROUP COMPONENT
MAIN.
UNIT SUPPORT SUPPORT
DEPOT TOOLS AND TEST
NUMBER ASSEMBLY FUNCTION
CO
F
H
D
EQUIPMENT
REMARKS
Locking Hooks, Inspect
0.2
4
Blade Assembly, Replace0.5
4,5,7
Bulldozer
Hydraulic
Inspect
0.3
4
Pump Assembly Replace3.0
4,5
Repair
3.0
4,8
2406
Filter, Oil
Service
0.5
4,5
Reservoir
Bulldozer
2406
Hoses, Lines
Inspect
0.3
4
and Fittings-
Replace1.0
4,5,7
Bulldozer
Repair 1.0
4,5,7
Cylinder
Inspect
0.2
4
Assembly, Right Replace30
4,5,7
and Left-Bull-
Repair
4.0
4,5,8
dozer
Ram Assembly,
Inspect
2.5
4,8
Right and Left
Replace
3.0
4,8
Cylinders-Bull-
Repair
1.0
4,8
dozer
Reservoir, Oil
Inspect
0.1
4
Hydraulic
Service
0.5
0.5
4,5
System-Bull-
Repair
0.6
4,5
dozer
D-6