PRELIMINARY PROCEDURES:
LOWER MOLDBOARD TO GROUND.
STOP VEHICLE ENGINE AND APPLY PARKING BRAKE.
REMOVAL: REMOVE NUT, LOCKWASHER
AND
REMOVAL: REMOVE
FOUR
U-BOLTS
AND
EYEBOLT SECURING RETAINING CLAMP.
RETAINERS FROM CABLE.
REMOVE CABLE FROM RETAINING CLAMP.
REMOVE CABLE
AND
METAL
TUBE
FROM
MOLDBOARD.
REMOVE CABLE FROM LIFTING HANDLE.
INSTALLATION: INSERT CABLE END THROUGH
INSTALLATION: TIGHTEN NUT. LOCKWASHER AND
OUTBOARD HOLE IN MOLDBOARD RIB; POSITION
EYEBOLT SECURING RETAINING CLAMP.
METAL TUBE THROUGH HOLE; OVERLAP CABLE
END 14-1/2 INCHES.
INSTALL CABLE IN RETAINING CLAMP.
INSTALL U-BOLTS, RETAINERS.
POSITION U-
BOLTS APPROXIMATELY 2 INCHES FROM ENDS OF
INSERT
CABLE
THROUGH
LIFTING
HANDLE.
OVERLAP AND SPACE AS SHOWN.
Figure 3-43. Removal or installation of emergency lifting cables.
3-59