(1)
Install grommets (6) and rods (15) in cable
sockets (25) into cable (17).
(6) Invert the adapter assembly.
(17).
(2) Install cable into adapter (10).
(7) Assemble gasket (5), ring (11), nut (12)
rivet (14), and holder (13) on adapter and s: cure with
(3) Install gasket (20) on adapter.
(4) Place base (21) on gasket and adapter and
three secure (3), washers (4), lockwasher (6) and nuts
(7).
(8) Install insert (2)and seven pins (1).
(9) and nuts (8).
(5) Install gasket (26), inert (24) and seven
Section VII. MOLDBOARD CYLINDER AND RAM
(6) Separate piston ring (7) from piston (8).
4-27. General.
(7) Remove packing set (9) from piston (10).
4-28. Refer to organizational maintenance section for
(8) Slide piston (10) from piston rod (21).
description and operation of the moldboard cylinder and
bulldozer will be placed in administrative storage
ram assemblies.
storms, wind storms, or other severe weather
4-29. MoIdboard Cylinder end Ram.
(9) Remove washer (11) from piston rod (21).
a. Removal and Installation.
(10) Slide piston rod (21) from cylinder head
(1) Refer to hydraulic cylinder and ram
(13).
(11) Remove seal (16) from packing gland (17).
(12) Cut lockwire (20) and remove two screws
installation.
(19) from cylinder head (13).
b. Disassembly. To disassemble the moldboard
(13) Remove pacing gland (17) and packing set
cylinder and ram, refer to figure 4-3 and proceed as
(18) from cylinder head (13).
follows.
(14) Remove threaded ram head (22) from
(1) Remove eight screws and washers (15 and
piston rod (21).
14) from cylinder head (13).
(15) Drive bushing (23) from ram head (22).
(2) Slide cylinder (4) from piston assembly.
(3) Remove ring (12) from grove in cylinder
instructions.
(4).
d. Inspection. Check the components for wear
(4) Remove cotter pin (5) from nut (6) and
remove nut (6) from piston rod (21).
(5) Remove piston (8) from piston rod (21).
4-10