REMOVE/INSTALL PUMP AND DRIVE ASSEMBLY
REMOVE/POSITION
SPROCKET
ASSEMBLY
FROM/ON POWER TAKEOFF IN TRANSMISSION
AT 19712
Figure 4-15. Replacement. disassembly or reassemble of right-angle drive power take-off sprocket.
Table 4-11. Repair and Rebuild Standards for Electromagnetic Clutch
Wire Limits
Refer-
Direct &
Figure
ence
Point
Size and Fit
General
Number
Letter
Measurement
of New Parts
Support
Depot
(∗)
(∗)
A
ID of spider recess for bearing
2.4409 to 2.4416
(∗)
(∗)
4-13
B
OD of bearing
2.4404 to 2.4409
(∗)
(∗)
4-13
A-I
Fit of bearing ill spider
.0000 to .0012L
(∗)
(∗)
4-13
C
ID of bearing
1.1807 to 1.1811
(∗)
(∗)
4-13
D
OD of shaft
1.1812 to 1.1816
(∗)
(∗)
4-13
C-D
Fit of shaft in bearing
0.001T to .0009T
(∗)
(∗)
4-13
E
OD of shaft
1.3781 to 1.3785
(∗)
(∗)
4-13
E-F
Fit of shaft in bearing
.0000 to .0010T
(∗)
(∗)
4-13
G
ID of magnet body recess for
2.4400 to 2.4416
bearings
(∗)
(∗)
4-13
H
2.4404 to 2.4409
(∗)
(∗)
4-13
G-H
0000 to .0012L
body
4-28