TM 9-3418-201-14 & P
RECEIVING
Before accepting the machine
,a preliminary examination should be made
for any possible damage in transit. If there is evidence of such damage a notation to that effect should be made
on the receipt and the machine received subject to thorough inspection. When the extent of the damage has been
determined, your reports should be filed.
HANDLING
The best method of handling the shaper is by means of a crane with adequate capacity. By removing the top
boards of the crate and the water proof covering, a rope or sling may be attached as shown. The sling should be
crossed over the crane hook to prevent slipping. A sling to carry a load of at least 10,000 pounds should be used.
If no crane is available rollers must be used. In moving the machine on rollers leave the skids attached until it has
reached the place of installation. Always be careful that the ends of the skids do not drop off a roller as damage to
the machine may result.
1