TM 9-4110-254-14
b
Installation
(1)
Wrap anti-seize tape around pressure gage (6) connector threads.
(2)
Install pressure gage (6), three screws (5), and new self locking nuts (4).
(3)
Install coupling (3).
(4)
Aline copper tubing (2) and connect flare nut (1) to coupling (3)
NOTE
FOLLOW-ON MAINTENANCE'
Close left side door
Unlatch and close control box cover door
5-67