TM 9-4110-256-14
b.
Installation.
(1)
Wrap anti-seize tape around pressure gage (6) connector threads.
(2)
Install pressure gage (6), three bolts (5), and new self locking nuts (4).
(3)
Install coupling (3).
(4)
Aline copper tubing (2) and connect flare nut (1) to coupling (3).
NOTE
FOLLOW-ON MAINTENANCE:
Close control panel cover.
5-37