4-45. JUNCTION BOX REMOVAL/lNSTALLATION - Continued.
(10) Using wrench, remove lock nut and flat washer from ground wire lead.
(11) Disconnect JB-GND-FR-GND lead from junction box.
(12) Using wrench, remove four cap screws and flat washers from side of junction box.
(13) Using wrench, remove two cap screws and fiat washers from lower right junction box mounting foot.
(14) Carefully lift junction box up and out of air conditioner.
b . Installation
Place junction box in air conditioner and aline mounting holes.
(1)
Using wrench, secure junction box lower right mounting foot with two cap screws and flat washers.
(2)
Using wrench, secure junction box to left side panel with four cap screws and flat washers.
(3)
Place JB-GND-FR-GND lead on junction box ground stud. Using wrench, secure with flat washer and nut.
(4)
(5)
Check that circuit breaker reset knob on rear of air conditioner is pushed in ail the way.
Insert push-pull control wire end through hole in top of actuator arm.
(6)
(7)
Slip core end fitting on push-pull control wire end and use screwdriver to tighten screw.
Flip circuit breaker to OFF (down) position.
(8)
Using screwdriver and wrench, secure pushpull control wire casing with spacer plate, clamp, and two
(9)
screws, lock washers, and nuts.
(1o) Check that circuit breaker is turned on when knob on rear of air conditioner is pulled out and pushed in.
Pushing knob in should not turn circuit breaker off.