TM 9-4120-385-14
Table 4-1. UNIT PREVENTIVE MAINTENENCE CHECKS AND SERVICES - Continued
FOR READINESS
INTERVAL
PROCEDURES
REPORTING
(CHECK/AND HAVE
EQUIPMENT IS
ITEM TO BE
NOT READY/
REPAIRED AND ADJUSTED
W
M
Q
No.
AS NECESSARY)
INSPECTED
AVAILABLE IF:
24
Casing
Cracked,
Inspect for loose, damaged, or
extensive
missing rivet nuts, rivet nut
damage
plates, rubber insulating foam,
and insulating sheet. Inspect for
other damage. Refer repairs to
Direct Support Maintenance.
25
Power Input
Missing, frayed,
Check for broken solder joints,
Cable
broken pins,
damage to connector, wires, and
broken shell
terminals. Repair or replace as
necessary.
4-14