Quantcast PURGING PROCEDURE.

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM
9-4120-385-14
b. PURGING PROCEDURE.
1. Open both service valves on the unit.
2.
Open nitrogen cylinder valve and allow dry nitrogen to flow through the system
until brazing/debrazing operation is complete or moisture is removed from the system.
NOTE
A minimum of 5 minutes of nitrogen purge is required for moisture
removal.
3.
Close nitrogen cylinder valve.
4.
Close both unit service valves.
5.
Loosen service hoses to drain pressure in hoses.
6.
Disconnect hoses and reinstall service valve caps.

Construction News

 


Privacy Statement - Copyright Information. - Contact Us

comments powered by Disqus

Integrated Publishing, Inc.
9438 US Hwy 19N #311 Port Richey, FL 34668

Phone For Parts Inquiries: (727) 755-3260
Google +