TM 9-4120-388-14
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Equipment Condition
Junction box removed (4-46).
Removal.
a.
(1) Be sure power has been disconnected.
(2) Discharge the refrigeration system in accordance with paragraph 5-7.
Disconnect wiring harness connector (P6) from (J6) on solenoid valve (L2) or connector (P5) from connec-
(3)
Remove nut that attaches coil to valve body.
(4)
Remove coil assembly and data plate.
(5)
Remove two screws that attach tube and plunger assembly to valve body. Remove tube and plunger as-
(6)
sembly, and all other removable internal components from valve body.
(7)
Check valve body for visible damage. Normally valve body replacement is unnecessary. If valve body is
in good condition, skip steps (8) through (10).
(8)
Remove two screws and Iockwashers that attach base of valve body to casing side panel.
(9)
Purge the system with nitrogen and debraze the tube connections. (See para 5-8 and 5-9.)
(10) Remove the valve body.