TM9-4120-400-14
4-49.
CONNECTORS (INSTALLATION). - continued
NOTE
There are three connectors supplied with each air conditioner.
The input power cable connector (P1) is used at the unit end of the input power cable. It
can be connected to the J1 receptacle located above the control module or the J11
receptacle located on the upper left rear corner of the unit.
The other two remote control module cable connectors are used when the control
module is to be installed remote from the air conditioner. (See para 4-5.)
INSPECTION
Check for loose, missing, or damaged pins and cut, or broken wires on connector or any other damage.
REPLACEMENT
Replace damaged wires or connectors and connectors with missing, loose, or damaged pins.
NOTE
FOLLOW-ON MAINTENANCE:
Connect power at power source.
INSTALLATION HARDWARE.
This task covers:
b. Replacement
a. Inspection
INITIAL SETUP
Tools
Equipment Condition
Disconnect power at power source.
Refrigeration Unit Service Tool Kit
NOTE
Each unit is supplied with mounting hardware for the four base attachment points.
Inspection
Inspect hardware to be sure it is tight, properly installed, and in good condition.
REPLACEMENT
Replace missing, damaged, or defective parts.
NOTE
FOLLOW-ON MAINTENANCE:
Connect power at power source.
4-117