TM9-4120-400-14
[
]
5-24.
This task covers:
Replacement
INITIAL SETUP
Tools
Equipment Condition
Refrigeration Unit Service Tool Kit
Materials/Parts
Solenoid Valve
Flush Bushings (2)
REPLACEMENT
1. Remove top nut (1), data plate (2), and coil (3) from tube and plunger assembly (4). Carefully lay coil (3) aside.
2. Remove two screws (5), tube and plunger assembly (4) , O-ring (6), and diaphragm (7) from valve body (8).
3. Remove two screws (9) and spacers (10) that attach valve body (8) to the housing.
4. Debraze joints and remove valve body (8). (See para 5-12.)
5-58