TM 9-4120-402-14
4-4.
SERVICE UPON RECEIPT OF MATERIAL.
a.
Unloading. The Air Conditioner is packaged in a container designed for shipment and handling with the
cabinet in an upright position. The base of the container is constructed as a shipping pallet with provisions for the
insertion of the tongs of a fork on material handling equipment.
(1)
Remove all blocking and tiedowns that may have been used to secure the container to the carrier.
(2)
Use a forklift truck or other suitable material handling equipment to remove the packaged unit from the
carrier.
Figure 4-2. Unpacking
4-10