TM 9-4120-402-14
(3)
Keco Industries (Howell) motor.
(a)
To replace connector (1):
1
Remove four screws (2) and conduit box cover (3).
2
Remove four sets of screws (4) and lock washers (5).
3
Pull connector (1) as far out of conduit box (6) as wire leads will allow.
4
5 See wiring diagram figure 4-10 and tags. Solder leads to new connector (1). Remove tags. (See paragraph
6
Secure connector (1) to conduit box (6) with four sets of screws (4) and lock washers (5).
7
Secure conduit box cover (3) to conduit box (6) with four screws (2).
SEE FIGURE 5-
2
SEE FIGURE 5-
5-
29