TM 9-4120-403-14
4-54.
HEATER CUTOUT (THERMOSTAT) SWITCH (S3)
This task covers:
a. Inspection
c. Test
b. Removal
d. Installation
INITIAL SETUP
Tools
Tool Kit, Refrigeration
Materials/Parts
Locknuts
Equipment Conditions:
Figure 4-50. Heater Cutout (Thermostat) Switch (S3)
4-134