TM 9-4120-403-14
(14) Seal grommet and capillary line at bulkhead opening.
Follow-on procedures:
(3) Leak test all newly connected joints and those in the repaired area. (See para 5-10.)
(5) Charge the refrigerant system, but do not operate unit. (See para 5-12.)
(8) Operate air conditioner and check operation. (See para 5-12.)
(9) Install heater elements (HR1 thru HR6) and support. (See para 4-58)
5-48