TM 9-4120-407-14
3-26. EMI FILTERS AND SUPPRESSORS TESTING AND REPLACEMENT.
b. Removal
c. Installation
a. Testing
This task covers:
INITIAL SETUP
Tools
Materials/Parts
Service Refrigeration Unit Tool Kit
Equipment Conditions:
a. Testing.
(1) EMI Filter (FL1) Testing.
(a) Tag and disconnect wiring harness connectors from EM1 filter (FLl) (1) Figure 3-36.
Figure 3-36. EMI Filters
(1).
1 Check for continuity between connector J15 pin E to J16 pin E. Continuity should be
indicated.
2 Check for continuity between connector J15 or J16 pm E to EMI filter case. Continuity
should be indicated.
3 Check for continuity between connector J15 pins A, B, C, and D in sequence to matching pins
A, B, C, and D on connector J16. Continuity should be indicated.
3-98