TM 9-4120-407-14
b. Installation.
(1) Install ball (15), spring (14), and new cotter pm (13).
(2) Install drain tube (12).
(3) Install hose (11) and spring tension clip (10).
(4) Install tee (9) and spring tension clip (8).
(5) Install hose (7), springs tension clip (6) and clamp (5).
(6) Install hose (4), clamp (1), and spring tension clip (3).
(7) Tighten clamp (2).
NOTE
FOLLOW-ON MAINTENANCE:
SECTION VII PREPARATION FOR STORAGE OR SHIPMENT
3-41. PREPARATION FOR STORAGE.
a . Placement of equipment in administrative storage should be for short periods of time when a shortage
of maintenance effort exists. Items should be in mission readiness within 24 hours or within the time factors
as determined by the directing authority. During the storage period, appropriate maintenance records will
be kept.
b. Before placing equipment in administrative storage, current Preventive Maintenance Checks and
Services (PMCS) evaluations should be compiled, shortcomings and deficiencies should be corrected, and all
Modification Work Orders (MWO' ) should be applied.
s
c. Storage site selection. Inside storage is preferred for items selected for administrative storage. If
inside storage is not available, trucks, vans, conex containers and other containers may be used.
3-135/(3-136 blank)