TM 9-4120-408-14
SECTION I. LUBRICATION INSTRUCTIONS
No lubrication is required.
SECTION II. REPAIR PARTS; SPECIAL TOOLS; TEST, MEASUREMENT, AND
DIAGNOSTIC EQUIPMENT (TMDE); AND SUPPORT EQUIPMENT
4-1. COMMON TOOLS AND EQUIPMENT.
For authorized common tools and equipment, refer to Modified Table of Organization and Equipment (MTOE), Common
Table of Allowances (CTA) 50-970 or CTA 8-100 as applicable to your unit.
4-2. SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT.
Special tools, TMDE, and support equipment are listed in TM 9-4120-408-24P, Repair Parts and Special Tools List
(RPSTL) for the Air Conditioner: Split Pack, 30,000 BTUH, 28VDC covering unit, direct support, and general support
maintenance, or the Maintenance Allocation Chart (MAC), Appendix B of the manual.
4-3. REPAIR PARTS.
Refer to Mandatory Replacement Parts, Appendix G. for parts that must be stocked for proper repair of the air
conditioner. Repair parts are listed and illustrated in TM 9-4120-408-24P covering unit, direct support, and general
support maintenance of this equipment.
SECTION III. SERVICE UPON RECEIPT
4-4. UNPACKING.
The initial unpacking will be performed by the systems integrator prior to equipment delivery.
4-5. CHECKING UNPACKED EQUIPMENT.
Initial checking of unpacked equipment will be performed by the systems integrator prior to equipment delivery. Perform
Unit PMCS prior to placing air conditioner into service. Should an equipment problem arise shortly after initial operation,
notify your supervisor.
4-6. PROCESSING UNPACKED EQUIPMENT.
Initial processing of unpacked equipment will be performed by the systems integrator prior to equipment delivery.
4-7. INSTALLATION.
For installation of control module assembly, refer to applicable technical manual.
4-2