TM 9-4120-408-14
Figure 4-24. Differential Pressure Switch Maintenance.
SECTION VII. PREPARATION FOR STORAGE OR SHIPMENT
4-31. SPECIAL INSTRUCTIONS FOR ADMINISTRATIVE STORAGE.
Placement of equipment in administrative storage should be for short periods of time when a shortage of maintenance
effort exists. Items should be in mission readiness within 24 hours or within the time factors as determined by the
directing authority. During the storage period, appropriate maintenance records will be kept.
Before placing the equipment in administrative storage, current preventive maintenance checks and services should be
completed, shortcomings and deficiencies should be corrected, and all modification work orders (MWOs) should be
applied.
Storage site selection. Inside storage is preferred for items selected for administrative storage. If inside storage is not
available, trucks, vans, convex containers, and other containers may be used.
Preservation procedures and marking requirements for storage and shipment are given in paragraph 5-32.
4-50