TM 9-4910-387-14-1
B BEFORE
D DURING
W WEEKLY
Procedure
Item to be
For Readiness Reporting
Check for have Repaired
Inspected
Equipment will be Reported
ITEM
INTERVAL
or Adjusted as Necessary
Not Ready/Available if:
NO.
B
D
W
12
POWER CABLE
Check power cable for cracks and burned or
damaged condition. Check terminals and connec-
tions for tightness and corrosion. Clean with rag
(item 14, app C) and tighten as necessary.
13
LUBE OIL,
Remove LH panel assembly and check for clogged
PRIMARY FUEL,
filter elements. Clean inner and outer surfaces
AND SECONDARY
with cleaning compound (item 3, app C) using
FUEL FILTERS
rag (item 14, app C).
2-17