OPERATING INSTRUCTIONS
Section I.
SERVICE UPON RECEIPT OF MATERIEL
b. Cleaning. Clean all parts of the test stand
a. When a new or reconditioned test stand
is first received, it is the responsibility of the
c. Installation.
officer in charge to determine whether the mate-
(1) R e g u l a t o r mounting bracket assembly
riel has been properly prepared for service by
(fig. 6). The mounting base for
the
the supplying organization and to be sure it is
r e g u l a t o r mounting bracket assembly
in condition to perform its function. For this
is shipped installed on the test stand.
purpose, assure that all authorized repair parts,
The mounting plate for the regulator
tools, and equipment are present and in good
mounting bracket assembly is shipped
c o n d i t i o n ; inspect all assemblies and parts to
stored in one of the stowage compart-
be sure they are properly assembled, secured,
m e n t s . Place the mounting plate on
c l e a n e d , adjusted, and/or lubricated.
the mounting base and aline holes in
b. Make a record of any missing parts and/or
the plate with those in the base and
e q u i p m e n t , and of any malfunctions. Correct
s e c u r e the plate with the four bolts
any deficiencies as quickly as possible.
and nuts provided.
(2) G e n e r a t o r , a l t e r n a t o r , a n d s t a r t e r
mounting bracket assembly.
a . U n p a c k i n g a n d c h e c k i n g . Place the e x -
terior container containing the test stand in an
Note. The key numbers shown below in
a r e a where there is sufficient working space.
(a) P l a c e the mounting bracket (3-C)
Remove the nails securing the top section of the
i n position on the mounting plate
exterior container to the skid-type base under
( 6 ) and secure with the locking
the test stand. Lift the top section off as a unit
handle (3-F).
from the base. The skid-type base will be left
(b) P l a c e t h e c h a i n v i s e ( 3 - B ) a n d
i n t a c t until test stand is located in position
chain (3-A) in position on the
d u r i n g installation, c below. Remove the bar-
m o u n t i n g bracket (3-C), inserting
rier material enveloping the test stand and all
t h e lever on the end of the chain
c u s h i o n i n g material, desiccant (bags), and
( 3 - A ) in the slot of the mounting
w r a p p i n g s from the test stand. Remove the
b r a c k e t ( 3 - C ) . S e c u r e the chain
boxed equipment and loose parts from the stor-
v i s e to the mounting bracket with
age compartments of the test stand. Particular
the -inch split lock washer (3-D)
attention should be given to the area behind the
and -13 hexagon plain nut (3-E).
a c c e s s door of the high voltage compartment
(3) Batteries. Install one 12-volt and two
(fig. 6) as
there are power leads located near
6 - v o l t batteries or four 6-volt bat-
or within this area. Unpack the equipment and
t e r i e s (for 6-12-24 volt hook-up) in
parts from the boxes. Check the equipment and
t h e battery compartment of the test
stand and connect in accordance with
every item is present and in good condition.
battery wiring diagram (fig. 8).