TM 9-4120-405-13&P
d.
Refer to TM 9-2330-202-14&P and disconnect trailer from towing vehicle.
WARNING
Serious injury to personnel can result if the trailer up-ends when disconnected
from the towing vehicle. Trailer leg prop assembly must be down before operating
the equipment.
e.
Pull out pin (1) that secured leg prop assembly (2) in traveling position. Refer to figure 4-4.
f. Pull leg prop assembly (1) down.
Insert pin (2) in bracket (3) to secure leg prop assembly (1) in operating
g.
Turn leg base (4) until it makes firm contact with ground.
Refer to MIL-HDBK-116, Environmental Control of Small Shelters for
4-10. PREPARATION FOR INSTALLATION.
general information.
4-11. INSTALLATION INSTRUCTIONS. All alterations to
the shelter or
facility into which the trailer-mounted, generator-
set powered, air conditioner with power is to be installed should be complete before installation of air conditioner.
a.
Position trailer so that air conditioner duct adapters can be easily attached to the shelter. (Refer to paragraph
b.
c.
Secure flexible ducts to shelter using mounting hardware. (Ref er to paragraph 4-13).
NOTE
Seal all openings around flexible ducts; air and watertight. Use gasket, caulking,
d.
e.
Install auxiliary fuel hose to be used and fuel drum adapter. (Refer to paragraph 4-15).
f.
g.
Secure shelter adapter onto shelter. Refer to figure 4-5.
NOTE
Take care not to damage the rubber molded gasket on shelter adapter during
installation.
h.
Refer to air conditioner electrical schematic, TM 5-4120-384-14, for additional wiring information.
4-10