TM 9-4120-405-13&P
This Task Covers:
Replace
Initial Setup:
Tools Required
Tool kit, general mechanics
Hoist, trestle
Chain, hoist
Personnel Required
Two persons required
Equipment Condition
REMOVAL.
1.
Remove eight nuts (1), eight flat washers (2), eight beveled washers (3), eight flat washers (4), and eight screws
(5).
2.
Dismount generator set (6) from mounting rails (7).
INSTALLATION.
1.
Mount generator set (6) on mounting rails (7).
2. Install eight screws (5), eight flat washers (4), eight beveled washers (3), eight flat washers (2), and eight nuts (1).
3.
4.
5.
6.
5-7