Home
Download PDF
Order CD-ROM
Order in Print
Grounding
Power Connections
TM-11-5895-223-15 Operations Center Communications AN/MSC-31 Manual
Page Navigation
21
22
23
24
25
26
27
28
29
30
31
trance
box
(fig.
8).
i.
Connect
one
end
of the
ground
strap
to the
ground
rod.
Connect
the
other
end
of
the
ground
strap
to
the
bottom
GROUND
j.
Replace
the
sledge
hammer in its
TERMINAL
in the
power
and
signal
en-
mounting
(fig.
14).
.