TM 9-2320-209-10-1
(2)
Operating 115-volt dome and blackout lights under blackout
conditions.
FRAME 1
Place POWER SWITCH 115-VAC handle (1) in ON (up) position.
1.
2.
Place NO. 4 circuit breaker CEILING LAMP CIRCUIT (2) in ON position.
Place OPERATION BLACKOUT SWITCH 115-VAC SYSTEM (3) in up (on)
3.
position.
4-213