Home
Download PDF
Order CD-ROM
Order in Print
Lowering the A-Frame and Preparing Truck for Travel after Side Operation -CONT. - TM-9-2320-209-10-10357
Lowering the A-Frame and Preparing Truck for Travel after Side Operation -CONT. - TM-9-2320-209-10-10359
TM-9-2320-209-10-1 21/2-Ton 6X6 M44A1 and M44A2 Series Trucks (Multifuel) Manual
Page Navigation
334
335
336
337
338
339
340
341
342
343
344
TM
9-2320-209-20-1
1.
Take
winch
cable
(1)
out
of
A-frame
sheave
(2),
and
sheave
assembly
(3).
2.
Unhook
end
of
winch
cable
(1)
from
lashing
ring
(4).
Wind winch cable (1) onto winch drum. (Refer to
para 4-14
b.)
3.
GO TO
FRAME
4
I
4-304