TM 9-2320-211-10-1
Take out pins (1) from inner jack pin (2).
1.
2.
Take boom jacks (3) from inner jack pin (2).
Take inner jack pin (2) from boom extension (4).
3.
4.
Take pins (5) from T-pins (6).
Take T-pins (6) from boom jacks (3).
5.
Push inner section of boom jacks (3) into outer section until last holes line up.
6.
Push T-pins (6) through holes.
7.
Push pins (5) through holes in T-pins (6) and lock them.
8.
Pull CROWD control lever (7) toward operator to pull boom extension (4) in
9.
all the way. At same time, pull HOIST control lever (8) toward operator to
keep cable hook (9) from hitting load or ground.
GO TO FRAME 3
4-207