TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
NOTE
Both right and
left-side extension
bars are installed
the same way.
(12) Soldier A lifts and holds extension
bar (11) in place while Soldier B
installs pin (13) and quick pin (14).
(13) Install two towing shackles (4)
on tow spades (15) with
pins (3) and cotter pins (2).
(14) Remove two quick pins (16) and pins (17) from tow spades (15).
2-117