TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
(12) Remove cotter hairpin (13) and pin (14) and separate tow bar (11) at
pivot point (15).
(13) Soldier A and Soldier B hold one leg of tow bar (11) while Soldier C
removes cotter hairpin (16) and pin (17) from shackle (18).
(14) Soldier A and Soldier B hold other leg of tow bar (11) while Soldier C
removes cotter hairpin (16) and pin (17) from shackle (18).
(15) Install two pins (17) and cotter hairpins (16) in shackles (18).
(16) Aline legs of tow bar (11) at pivot point (15) and install pin (14) and
cotter hairpin (13).
(17) Stow tow bar (11).
2-143