TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
TOW M35 (CONT).
2-75.
NOTE
Safety chains can be routed to safety chain hoop, or
q
towing shackles. Towing shackles can be used only
after tow cylinders are extended.
Adjust chain slack so safety chains do not touch
q
ground.
(30) Route two safety chains (25) through safety chain hoop (31) on wrecker
and secure grab hook (32) with safety shackle (33).
(31) Disconnect two springs (1) from tow cylinders (2), wrap around
crosstube (7) and secure.
(32) Prepare disabled vehicle for towing (refer to M35 operator's manual).
(33) Remove emergency tow lights (34) and two brackets (35) from stowage.
(34) Install two brackets (35) in outside holes of emergency tow lights with
two screws (36), washers (37), and nuts (38).
2-226