TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
WARNING
Keep boom clear of electrical lines and other obstacles
while operating crane. Serious injury or death could
result upon contact.
(11) Remove cargo tiedown strap (14) from stowage and attach to center of
lift tube (15). Operate crane (para 2-63) and position lift tube on
ground. Remove and stow cargo tiedown strap.
NOTE
Both tube supports are the same. One tube support
shown.
(12) Remove two quick pins (16) and pins (17) from tube supports (18).
2-321