TM
9-2320-279-10-2
M984E1 General Operation Procedures (Cont)
NOTE
Right and left towing shackles are removed the same
way.
(3) Remove cotter pin (3), pin (4), and towing shackle (5) and stow.
(4) Pull LIFT CYLINDER control lever (6) to lower crosstube (7) to
approximately 3 ft (1 m) above ground.
(5) Position wrecker so that crosstube (7) is approximately 1 ft (30 cm)
from tow eyes of disabled vehicle and centered on disabled vehicle.
2-472