TM 9-2330-235-14&P
4-51.
This Task Covers:
a. Disassembly
c. Assembly
b. Cleaning and Inspection
Initial Setup:
Equipment Conditions:
Materials/Parts:
Sealing compound (Item 4, Appendix E).
Grease (Item 7, Appendix E)
Rags (Item 12, Appendix E)
Tools/Test Equipment:
General mechanic's tool kit
Dry cleaning solvent (Item 13, Appendix E)
Common no. 1 shop set
Marker tags (Item NO TAG, Appendix E)
One gasket
References:
One lubrication fitting
References:
TM 9-214
a.
DISASSEMBLY
NOTE
Tag bearings for assembly. DO NOT mix bearings.
1. Remove six screws (20) and lockwashers (21) from cover (22). Carefully remove cover from box (5). Discard
lockwashers.
2. Remove gasket (23) and two straight pins (30) form box (5). Discard gasket.
4-124