TM 9-2330-271-14 & P
Code
Definition
PA.....................Item procured and stocked for anticipated or known usage.
PB
Item procured and stocked for insurance purpose because
essentiality dictates that a minimum
quantity
be available in the supply systems.
PC
Item procured and stocked and which otherwise would be coded PA except that it is deteriorative in
nature.
PD.....................Support item, excluding support equipment, procured for initial issue or outfitting and stocked only for
subsequent or additional initial issues or outfittings
Not subject
to automatic replenishment.
PE.....................Support equipment procured and stocked for initial issue or outfitting to specified maintenance repair
activities.
PF .....................Support equipment which will not be stocked but which will
be centrally procured on demand.
PG
Item procured and stocked to provide for sustained support
for the life of the equipment
It is
applied to an
item peculiar to the equipment which, because of probable dis
continuance or shutdown of production
facilities, would prove uneconomical to reproduce at a later time.
KD
An item of depot overhaul/repair kit and not purchased separately
Depot kit defined as a kit that
provides
items required at the time of overhaul or repair.
KF .....................An item of a maintenance kit and not purchased separately.
Maintenance kit defined as a kit that provides an item that
can be replaced at organizational or
intermediate levels
of maintenance.
KB.....................Item included in both a depot overhaul/repair kit and a maintenance kit.
MO....................Item to be manufactured or fabricated at organizational level.
MF ....................Item to be manufactured or fabricated at the direct support
maintenance level.
MH ....................Item to be manufactured or fabricated at the general support
maintenance level.
MD ....................Item to be manufactured or fabricated at the depot maintenance level.
AO ....................Item to be assembled at organizational level.
AF .....................Item to be assembled at direct support maintenance level.
AH.....................Item to be assembled at general support maintenance level.
AD.....................Item to be assembled at depot maintenance level.
XA
Item is not procured or stocked because the requirements for
the item will result in replacement of
next
higher assembly.
E-3