TM 9-2330-373-14 & P
2-9. COUPLING SEMITRAILER TO TOWING VEHICLE (cont)
a. Two personnel required for this operation.
b. Raise ladder (1) with attached handrail (6) from its mounting brackets and set aside.
c. Turn both platform leg assembly screws (2) counterclockwise until footpad assemblies (3) clear the ground.
d. Raise platform (4) slightly to release stud (5) from mounting plate and remove platform.
e. Stow both front platform and boarding ladder with handrail in semitrailer front compartment.
TA 314713
2-14