TM 9-2330-381-14
h. Restrain Sixcon (10) in second position as follows:
(1) Route a 19-foot (5.8m) tiedown chain through front tine channel (12) of Sixcon with hook end on curbside of
platform. Position both ends of chain rearward to third platform tiedown ring (13).
(2) Using a shackle, attach hook end of chain to curbside platform tiedown ring. On streetside, use a shackle to
attach a loadbinder to platform tiedown ring. Pull all slack out of chain and attach to loadbinder. Tighten
loadbinder.
(3) Route a second 19-foot (5.8m) tiedown chain through rear tine channel (14) with hook end on streetside of
platform. Position both ends of chain forward to second platform tiedown ring (15).
(4) Using a shackle, attach hook end of chain to streetside platform tiedown ring. On curbside, use a shackle to
attach a loadbinder to platform tiedown ring. Pull all slack out of chain and attach to loadbinder. Tighten
loadbinder.
WARNING
Horizontal connectors must be fully aligned into the corners of the Sixcons being
joined and fully locked before payload is chained down. Failure to do so may
result in damage to equipment or injury to personnel.
i. Using 16 vertical connectors (16) stack four Sixcons (17) on top of four loaded on semitrailer platform. As each of
the sixth, seventh, and eighth Sixcons are lowered into position, use two horizontal connectors (18) to join upper
corners of Sixcons and lock in place.
j. Position four loadbinders (19) on semitrailer platform, one next to each of four semitrailer lifting eyes (20). Use
four towing shackles to attach loadbinders to lifting eyes.
Change 1 2-227