TM 9-2330-384-14&P
Table 2-1. Operator Preventive Maintenance Checks and Services (PMCS) (Con't).
M-Monthly
D-During
A-After
W-Weekly
B-Before
ITEM TO BE INSPECTED
INTERVAL
EQUIPMENT IS
NOT READY/
PROCEDURE: Check for and have Repaired, Filled, of
ITEM
AVAILABLE IF:
W
M Adjusted as required.
NO.
D
A
B
REAR OF SEMITRAILER (Con't)
4
Any damage is found
d. Check grounding stud (4) on roadside of
will
that
prevent
bumper for looseness or damage. Clean any
proper grounding of
paint, grease, or dirt on grounding contact
semitrailer.
surface. I f l o o s e o r d a m a g e d , n o t i f y u n i t
maintenance.
e. Check triple clearance light assembly (28)
cleanliness and cracks. Clean any dirty lights or
reflector lenses. If cracked or damaged, notify
unit maintenance.
f. Check splashguards (31) for presence.
Notify unit maintenance if missing.
g. Check that vapor return line (27) is securely
mounted with no obvious damage. Check that
dust cap (32) is in place.
h. Inspect ladder (29) for damage and security
of mounting. Notify unit maintenance of any
damage found.
2-16