TM 9-2330-394-13&P
CARGO COVER KIT INSTALLATION/REMOVAL - Continued
0014 00
SOFT TOP (STEEL BOWS) INSTALLATION - Continued
25. Open four flaps (26) on both support straps (20).
NOTE
Left and right strap supports have six flaps. From front to rear of trailer, perform step (26)
on first, second, third, and fifth straps on each strap support.
26. Position two braces (19) over front tube (2) and under both support straps (20) with approximately 2
feet (61 cm) between front bow (7) and between each brace (19).
27. Position two braces (19) over rear tube (3) and under both support straps (20) with approximately 2
feet (0.6 m) between rear bow (12) and each brace (19).
0014 00-13