Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
PREVENTIVE MAINTENANCE CHECKS AND SERVICES,
0042 00
INCLUDING LUBRICATION INSTRUCTIONS - Continued
Semiannual PMCS Procedures for Trailer (Field Level) - Continued
Table 10. Preventive Maintenance Checks and Services (PMCS) - Semiannual (Field Level).
FIELD-LEVEL MAINTENANCE
EQUIPMENT
ITEM
INTERVAL
MAN-
ITEM TO
PROCEDURE
NOT READY/
NO.
HOUR
BE
AVAILABLE
CHECKED
IF:
OR
SERVICED
NOTE
Separate towing vehicle road test
must be performed before coupling
towing vehicle to trailer. Perform
towing vehicle road test and resultant
towing vehicle maintenance as
outlined in TM 9-2320-365/366-20.
TRAILER ROAD TEST
Maintenance personnel will be with
towing vehicle/trailer operator during
the road test.
0042 00-54


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business