Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
CIRCUIT BREAKER AND MODULE REPLACEMENT - Continued
0053 00
MODULE INSTALLATION
NOTE
This task shows locations of Voltage Converter Box module wiring connection points. Refer
to Table 1 Voltage Converter Box Module Wiring Connections for details.
Modules 1 through 5 are installed the same way, Module 3 shown.
Install plastic cable ties as required.
1.
Install module (31) in voltage converter box (2) with two screws (30) and nuts (29).
0053 00-13


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business