Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
CIRCUIT BREAKER AND MODULE REPLACEMENT - Continued
0053 00
CLOSE VOLTAGE CONVERTER BOX COVER
1.
Close cover (4) and connect two latches (3) on voltage converter box (2).
2.
Tighten two screws (1) on voltage converter box (2).
OPERATIONAL CHECK
1.
Couple trailer (WP 0009 00, Coupling Trailer).
2.
Check for proper operation of trailer electrical system affected by replaced circuit breaker or module
(WP 0042 00, Table 1. Preventive Maintenance Checks and Services (PMCS) - Before).
END OF WORK PACKAGE
0053 00-16


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business