Custom Search
|
|
|
||
TM 9-2330-394-13&P
ANTI-LOCK BRAKING SYSTEM (ABS) CONTROL POWER
0068 00
HARNESS REPLACEMENT - Continued
INSTALLATION - Continued
18. Connect connector (2) to ABS control assembly (3) and push down on connector retainer clip (1) to
secure.
OPERATIONAL CHECK
1.
Couple trailer (WP 009 00, Coupling Trailer).
2.
Start towing vehicle engine and allow for air pressure to reach normal operating air pressure.
3.
Road test trailer and check for proper brake operation.
4.
Uncouple trailer (WP 0012 00, Uncoupling Trailer).
END OF WORK PACKAGE
0068 00-15/16 Blank
|
||