Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
LANDING GEAR WINCH CABLE REPLACEMENT - Continued
0086 00
INSTALLATION - Continued
4.
Install clevis (4), two washers (3), and clevis pin (2) on landing gear (5).
5.
Install cotter pin (1) in end of clevis pin (2).
OPERATIONAL CHECK
1.
Couple trailer (WP 009 00 Coupling Trailer).
2.
Operate landing gear winch (WP 0013 00, Raising Landing Gear/Lowering Landing Gear).
3.
Uncouple trailer (WP 0012 00 Uncoupling Trailer).
END OF WORK PACKAGE
0086 00-4


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business